Overview
Results are used to verify that switchgear, breakers, cables and busbars are rated to withstand and interrupt those currents, and provide the basis for protection settings.
What our engagement covers
1
Site Measurements
2
Data Collection & Verification
3
Data Analysis
4
Report Preparation
5
Recommendations
6
Selection of Vendors
7
Implementation Assistance
8
Reference Check
Instruments we use on site
ALM-30 3-Phase Power Analyzer
Single Phase Power Analyzer / Clamp-on Meter
Ultrasonic Flow Meter
Flue Gas Analyser
Compressed Air Leak Detector
IR Gun
Lux Meter
Hygrometer
Anemometer
Manometer
Thermal Imager
TDS Meter